Skip to main content
Effective landfill closure at Homer Solid Waste Facility with GSE
Kenai Peninsula Borough in Alaska completed phase two of the Homer Solid Waste Facility landfill closure using Solmax geosynthetics, covering 226,000 ft² with a geosynthetic clay liner, drainage, and landfill-gas system.